Future Projects

The following projects are planned for the airport: 

  • 2018 Fog and Crack Seal Runway 16 to 34 - Design and Construction
  • 2018 Runway 11 to 29 Overlay - Design and Construction
  • 2018 Reconstruction of Hangar Taxi lanes - Design and Construction: The project involves the design and reconstruction of existing taxi lanes on the east side of the field that will be reconstructed or milled and overlaid to extend the pavement's useful life.